KRISO-WETS (Korea Research Institute of Ships & Ocean Engineering – Wave Energy Test Site)
KRISO-WETS (Korea Research Institute of Ships & Ocean Engineering – Wave Energy Test Site)
Lead Organisation KRISO (Korea Research Institute of Ships & Ocean Engineering)
Country Republic of Korea
Type Wave, Floating Wind
Website https://www.kriso.re.kr/menu.es?mid=a20203000000
  • Type of Testing Wave, Floating Wind
    Year Established 2020
    Temperate/Tropical Temperate
    Commercial/Array/Full scale/Scale Full scale, Scale
    Development Status Operational

    Overview

    The KRISO-WETS (Korea Research Institute of Ships & Ocean Engineering - Wave Energy Test Site) located in the western water side of Jeju Island, was officially opened in the last September 2020. There are five berths including the existing Yongsoo OWC-type WEC, which is working as the first berth for the OWC-type WECs and also as the offshore substation for the open-sea test site. KRISO led this construction project, and the total budget is about 17.3 million USD. Four more berths, two in shallow water (about 20 meters) and two in deep water (about 40-60 meters), are connected to the offshore substation and grid system, with a total capacity of 5 MW. The fifth berth, 60 meters deep, is expected to be used for floating offshore wind turbines as well.
  • Number of Berths 5
    Water Depth 20 m ~ 60 m
    Min Water Depth (m) 20
    Max Water Depth (m) 60
    Avg Water Depth (m)
    Annual mean significant wave height 6 m
    Maximum recorded wave height
    Mean (averaged current speed) 1.3 m/s
    Maximum current speed
    Maximum tidal range 0.5 - 3.4 m
    Mean wind speed 17.2 m/s
    Max wind speed
    Seabed type shallow sediment on soft rock
    Total test area (km2) 1.04
    Distance to land 1.2 km
    Grid connected Y
    Grid connection capacity 5 MW
    Rated export capacity and connection 1 MW or more
    Proximity to nearest harbour (km) 25 km
  • Demonstration Projects

    Infrastructure

    grid connection : submarine cables for 5MW, 22.9kV(3 phase), 180A, SCADA for voyage safety with CCTV, AIS, V-PASS, and X-band radar, facility monitoring, and environment measurement
    offshore substation for integration of power from each berth via submarine cables
    onshore supporting facilities including control room with SCADA, onshore substation, promotion room, and office space for guest

    Equipment available to support site deployments

    weather station for wind and other meteorological data
    wave measurement instrument of ADCP type at shallow water (20m) and wave buoy type at deeper water (40m)

    Services of test programmes offered on site

    power performance assessment, environmental monitoring, and consenting process